|
|
|
5 Orton Orton Cambridgeshire PE2 6XU Tel:
01733 230 033 Fax:
01733 230 993 e-mail: bsa@sign.u-net.com Internet:: www.bsga.co.uk Sector Partner |
|||||
|
|
|||||||
|
Signmaking |
|
||||||
|
S/NVQ
Level 2 |
|
||||||
|
|
|
||||||
|
|
|
||||||
|
|
|
||||||
|
|
|
||||||
|
|
|
||||||
|
|
|
|
|
|
|||
|
Mandatory Units |
|
||||||
|
|
|
|
|
|
|||
|
UNIT A |
PROVIDE INFORMATION AND ADVICE ABOUT SIGN PRODUCTS |
|
|||||
|
Element A.1 Element A.2 Element A.3 |
Obtain and record
information on signmaking operations Provide information about
sign products and services Provide advice about sign
products and services |
|
|||||
|
|
|
||||||
|
UNIT B |
MONITOR AND MAINTAIN THE SAFETY OF THE WORKPLACE |
|
|||||
|
Element B.1 Element B.2 |
Monitor safety in the workplace Maintain health and safety in the workplace |
|
|||||
|
|
|
|
|
|
|||
|
UNIT C |
CREATE, DEVELOP AND MAINTAIN EFFECTIVE WORKING RELATIONSHIPS
(U1019986) |
|
|||||
|
Element C.1 Element C.2 |
Create, develop and
maintain effective working relationships with colleagues Create, develop and
maintain effective working relationships with external contacts |
|
|||||
|
|
|
||||||
|
UNIT D |
ASSURE THE QUALITY OF SIGN PRODUCTS TO MEET SPECIFICATION |
|
|||||
|
Element D.1 Element D.2 Element D.3 |
Detect variations from
specification in sign materials and products Determine the cause of
variations in products and materials Rectify variations and
record details |
|
|||||
|
|
|
||||||
|
UNIT E |
PREPARE FOR SIGN OPERATIONS |
|
|||||
|
Element E.2 Element E.3 |
Identify requirements for
sign operations Select and obtain
resources to make sign products Prepare work area for sign
operations |
|
|||||
|
|
|
||||||
|
UNIT F |
MAINTAIN THE WORK ENVIRONMENT |
|
|||||
|
Element F.1 Element F.2 |
Maintain work area Maintain tools and
equipment to specification |
|
|||||
|
|
|
|
|
|
|||
|
UNIT G |
PREVENT DAMAGE DURING TRANSPORTATION AND STORAGE OF SIGN PRODUCTS |
|
|||||
|
Element G.1 Element G.2 |
Protect finished products
during transportation Protect finished products
during storage |
|
|||||
|
|
|
|
|
|
|||
|
|
|
|
|
|
|||
|
|
|
|
|
|
|||
|
|
|
||||||
|
|
|
5 Orton Orton Cambridgeshire PE2 6XU Tel:
01733 230 033 Fax:
01733 230 993 e-mail: bsa@sign.u-net.com Internet:: www.bsga.co.uk Sector Partner |
|||||
|
|
|||||||
|
Signmaking |
|
||||||
|
S/NVQ
Level 2 |
|
||||||
|
|
|
||||||
|
|
|
||||||
|
|
|
||||||
|
|
|
||||||
|
|
|
||||||
|
|
|
|
|
|
|||
|
Optional Units |
|
||||||
|
|
|
|
|
|
|||
|
One Unit to be selected from the following: |
|
|
|||||
|
|
|
|
|
|
|||
|
UNIT H |
SHAPE, FORM, FINISH AND COMPLETE THE OPERATION |
|
|||||
|
Element H.1 Element H.2 Element H.3 Element H.4 Element H.5 |
Set out materials for
shaping by cutting Shape materials by cutting
to specification Form and bend materials to
specification Finish materials to
specification Complete operations to
specification |
|
|||||
|
|
|
||||||
|
UNIT J |
JOIN, FINISH AND COMPLETE OPERATIONS |
|
|||||
|
Element J.1 Element J.2 Element J.3 Element J.4 |
Bond materials to specification Assemble materials to specification Finish materials to specification Complete operations to specification |
|
|||||
|
|
|
|
|
|
|||
|
UNIT K |
ENGRAVE, FINISH AND COMPLETE DECORATIVE OPERATION |
|
|||||
|
Element K.1 Element K.2 Element K.3 |
Engrave materials and
products to decorate signs Finish materials to
specification Complete operations to
specification |
|
|||||
|
|
|
||||||
|
UNIT L |
ETCH, FINISH AND COMPLETE DECORATIVE OPERATION |
|
|||||
|
Element L.1 Element L.2 Element L.3 |
Etch materials and
products to decorate signs Finish materials to
specification Complete operations to
specification |
|
|||||
|
|
|
||||||
|
UNIT M |
HAND DECORATE, FINISH AND COMPLETE DECORATIVE OPERATION |
|
|||||
|
Element M.2 Element M.3 |
Hand decorate sign
materials and products Finish materials to
specification Complete operations to
specification |
|
|||||
|
|
|
||||||